47
Reference Manual
00809-0100-4021, Rev GC
Section 3: HART commissioning
April 2014
Disable Hot Backup in guided setup: Fast Keys 2-1-5
1.
From the Home Screen, choose
2 Configure
.
2.
Choose
1 Guided Setup
.
3.
Choose
5 Config Hot Backup
.
4.
When prompted, choose
1 Yes
to disable Hot Backup. To reconfigure Hot Backup,
choose
2 No
.
5.
When prompted, choose which variable you would like as your primary variable (PV)
and press
ENTER
. With Hot Backup disabled, the PV may be
Sensor 1 Temperature
,
Sensor 2 Temperature
,
Differential Temperature
,
Average Temperature
, or
First Good
Temperature
.
Summary of Contents for Rosemount
Page 1: ...Reference Manual 00809 0100 4021 Rev GC April 2014 Rosemount 3144P Temperature Transmitter ...
Page 2: ......
Page 4: ...iv Reference Manual 00809 0100 4021 Rev GC Title Page April 2014 ...
Page 10: ...x Reference Manual 00809 0100 4021 Rev GC Table of Contents April 2014 Table of Contents ...
Page 38: ...28 Reference Manual 00809 0100 4021 Rev GC Section 2 Installation April 2014 Installation ...
Page 188: ...178 Reference Manual 00809 0100 4021 Rev GC Section 5 Maintenance April 2014 Maintenance ...
Page 250: ...Index 244 Reference Manual 00809 0100 4021 Rev GC Index April 2014 Index ...
Page 251: ......