Figure 5-2: Front View Dimensions
A. Lifting eye bolt
B. Sample gas input port
C. Sample gas return port
D. Lifting eye bolt
E. 0.413-in. (10.5 mm) diameter mounting points
F. Purge compressed air supply port
3. One person should carefully guide the equipment while the other person operates
the lifting equipment.
4. Use safety approved and tested lifting equipment to lift the analyzer from the stable
platform.
Install
Reference Manual
October 2019
00809-0100-4512
52
Rosemount CT5100(Ex)
Summary of Contents for Rosemount CT5100
Page 16: ...16 ...
Page 20: ...Contents Reference Manual October 2019 00809 0100 4512 xx Rosemount CT5100 Ex ...
Page 28: ...Theory of operation Reference Manual October 2019 00809 0100 4512 28 Rosemount CT5100 Ex ...
Page 46: ...Specifications Reference Manual October 2019 00809 0100 4512 46 Rosemount CT5100 Ex ...
Page 66: ...Install Reference Manual October 2019 00809 0100 4512 66 Rosemount CT5100 Ex ...
Page 84: ...Start up procedure Reference Manual October 2019 00809 0100 4512 84 Rosemount CT5100 Ex ...
Page 92: ...Shutdown procedure Reference Manual October 2019 00809 0100 4512 92 Rosemount CT5100 Ex ...
Page 112: ...Gas calibration Reference Manual October 2019 00809 0100 4512 112 Rosemount CT5100 Ex ...