4. The system will work through the
ZERO
and
SPAN
calibration process for all
readings.
The
Please wait
screen will be displayed. This takes approximately one minute per
gas depending on the purge time.
Figure 10-28: Calibration
The
Finished
screen displays when the Zero and Span calibrations process
completes.
Figure 10-29: Calibration (Finished)
5. Press
BACK
.
This completes the process, and the display returns to the
Main menu
.
10.2.4
Change the automatic calibration settings
Procedure
1. To get to the
Main menu
, press the
MENU
button on the
Gas Sensor Main
screen
Pressure and Temperature
screen (
).
Gas calibration
Reference Manual
October 2019
00809-0100-4512
108
Rosemount CT5100(Ex)
Summary of Contents for Rosemount CT5100
Page 16: ...16 ...
Page 20: ...Contents Reference Manual October 2019 00809 0100 4512 xx Rosemount CT5100 Ex ...
Page 28: ...Theory of operation Reference Manual October 2019 00809 0100 4512 28 Rosemount CT5100 Ex ...
Page 46: ...Specifications Reference Manual October 2019 00809 0100 4512 46 Rosemount CT5100 Ex ...
Page 66: ...Install Reference Manual October 2019 00809 0100 4512 66 Rosemount CT5100 Ex ...
Page 84: ...Start up procedure Reference Manual October 2019 00809 0100 4512 84 Rosemount CT5100 Ex ...
Page 92: ...Shutdown procedure Reference Manual October 2019 00809 0100 4512 92 Rosemount CT5100 Ex ...
Page 112: ...Gas calibration Reference Manual October 2019 00809 0100 4512 112 Rosemount CT5100 Ex ...