Maintenance
189
User Manual
UM6C55C (P7000597)
Lorain Power System (AP6C55CA/CB)
Standard 10.00 (March 2008)
This document is property of Emerson Network Power, Energy Systems, North America, Inc. and contains confidential and proprietary information owned by Emerson Network Power, Energy
Systems, North America, Inc. Any copying, use, or disclosure of it without the written permission of Emerson Network Power, Energy Systems, North America, Inc. is strictly prohibited.
Figure 7.1 – Replacing the cooling fan on a Rectifier –48 V dc, 750 W or 1500 W
Screws
securing
the front
plate of
the
rectifier
Nuts
securing
the fan to
the front
plate
Fan connector
-48 V DC, 1500 W
7.5.6.
Replacing a distribution circuit breaker or fuse in a Lorain CIP or Lorain
CIP Access power system
Replace a distribution circuit breaker or fuse as described in the following
procedure.
Note:
When removing the circuit breaker or fuse block in the lowest
position, be careful not to damage any wires in the wire form coming out
of the slot in the bottom left hand corner of the distribution section.
Procedure 7.9 – Replacing a distribution circuit breaker or TPS fuse
Step Action
1
Notify the alarm center of the possibility of incoming alarms during this
procedure.
2
Open the front door of the controller and distribution section of the Lorain
CIP or Lorain CIP Access shelf.
3
For a circuit breaker, insure that it is in the OFF position, and then pull
firmly on it until it pulls out from the main DC rail and the associated load
clip.
For a TPS fuse, pull on the fuse holder containing the fuse to be replaced
until it comes out of its fuse block.
–continued–