![Electro Industries/GaugeTech Nexus 1262 User Manual Download Page 234](http://html.mh-extra.com/html/electro-industries-gaugetech/nexus-1262/nexus-1262_user-manual_2379732234.webp)
Doc# E151701 11-8
11: Switchboard Meter
Electro
Industries/GaugeTech
™
Powered by Innovation™
11.5: Wiring Diagrams
The wiring of the Switchboard meter is similar to that of the Socket meter.
Table 11.1: Switchboard Meter Configurations
The meter snaps into place and is secured with levers and screws. All input and
output connections are made automatically as the meter is installed. (Refer to Section
11.4 and Figure 11.8.)
Wiring options are shown in Figures 11.9 through 11.20.
NOTE:
For special requirements, contact our service department.
CAUTION!
All wiring should be done by a licensed professional. Actual installation
procedures, materials, equipment and connections must conform to applicable codes
and standards.
See Section 11.1 for important safety considerations.
ATTENTION!
Tout travail de câblage doit être effectué par un professionnel agréé.
Les procédures, matériaux, équipements et connexions d'installation actuels doivent
être conformes aux codes et aux normes applicables.
Pour voir d'importantes exi-
gences de sécurité, vous référer à Section 11.1.
Table 1:
Form
Description
Figure#
9Z
Wye, no PTs, 3 CTs
11.9
Wye, 3 PTs, 3 CTs
11.10
4-Wire Delta, no PTs, 3 CTs
11.11
4-Wire Delta, 3 PTs, 3 CTs
11.12
3-Wire Delta, no PTs, 2 CTs
11.13
3-Wire Delta, 2 PTs, 2 CTs
11.14
3-Wire Delta, no PTs, 2 CTs
11.15
3-Wire Delta, 2 PTs, 2 CTs
11.16
3-Wire Delta, 2 PTs, 3 CTs
11.19
3-Wire Delta, no PTs, 3 CTs
11.20
36Z
2.5 EL Wye, no PTs, 3 CTs
11.17
2.5 EL Wye, 2 PTs, 3 CTs
11.18
Summary of Contents for Nexus 1262
Page 1: ......
Page 2: ...This page intentionally left blank ...
Page 86: ... RF 2SHUDWLQJ QVWUXFWLRQV 7KLV SDJH LQWHQWLRQDOO OHIW EODQN ...
Page 97: ...This page intentionally left blank ...
Page 98: ......