![Ecolab Elados EMP KKS E60 Operating Instructions Manual Download Page 175](http://html.mh-extra.com/html/ecolab/elados-emp-kks-e60/elados-emp-kks-e60_operating-instructions-manual_2354530175.webp)
7.2.3
Connector assignment of slot II (5-terminal) Input for pulse signal, standard signal,
metering lock, batch and metering monitoring
Fig. 12: Slot II (5-terminal)
PIN
Conductor
color
Assignment
1
brown
output 5 V, DC (loadable with max. 50 mA)
2
white
pulse input
also as configurable batch / metering monitoring,
Chapter 10.3.13 ‘Configuration / Metering monitoring’
Chapter 10.3.15 ‘Configuration / Batch’
3
blue
metering lock
4
black
GND (┴)
5
grey
Input standard signal 0/4...20 mA
(plug assignments
Chapter 14.5.2 ‘Connector II ’ on page 125
).
1.
Remove the protective cap.
2.
Mount the connector plug according to the connector assignment.
CAUTION!
Only use a connector plug from our product range! (included in the delivery
scope).
Device installation
39
417101442 Rev. 12-02.2019
Summary of Contents for Elados EMP KKS E60
Page 2: ......
Page 123: ...14 2 Abmessungen Abb 89 Abmessungen Technische Daten 121 417101442 Rev 12 02 2019 ...
Page 135: ......
Page 258: ...14 2 Dimensions Fig 90 Dimensions Technical Specifications 122 417101442 Rev 12 02 2019 ...
Page 393: ...14 2 Dimensions Fig 93 Dimensions Données techniques 123 417101442 Rev 12 02 2019 ...
Page 405: ......