Fig. 8: Example 2
1
Injector valve / Metering valve
2
External release
3
Solenoid valve
4
Pressure control valve
The suction pipes must be kept as short as possible. Long and twisted suction pipes may
lead to air build up in the system.
The max. suction height is 2 m and the max. flow velocity is 0.3 m/s! (
14 ‘Technical Specifications’ on page 119
). Always lay the suction pipe so that it ascends
to the suction valve of the metering pump.
Example 3
Example 4
Example 5
Installation of a metering monitoring system:
A metering monitoring system – oval gear meter or flow indicator has to be
installed in the metering pipeline between the pressure relieve valve and the
pressure control resp. metering valve.
Device installation
34
417101442 Rev. 12-02.2019
Summary of Contents for Elados EMP KKS E60
Page 2: ......
Page 123: ...14 2 Abmessungen Abb 89 Abmessungen Technische Daten 121 417101442 Rev 12 02 2019 ...
Page 135: ......
Page 258: ...14 2 Dimensions Fig 90 Dimensions Technical Specifications 122 417101442 Rev 12 02 2019 ...
Page 393: ...14 2 Dimensions Fig 93 Dimensions Données techniques 123 417101442 Rev 12 02 2019 ...
Page 405: ......