7.2.3.4 Installation Chargenfunktion
NOTICE!
The batch function must be activated in menu first.
The selection must also be made of whether the pins 2+4 (input “pulse”) or 3+4
(input “metering lock”) should be used for the batch metering start pulse
Chapter 10.3.5 ‘Configuration / Code’ on page 73
Fig. 16: Installing the batch function
2 + 4 = Input batch function with potential-free contact with selection input
„pulse“ at configuration / batch (
Chapter 10.3.15 ‘Configuration / Batch’
PIN
Assignment
2
Relay input
4
GND (┴)
1 +2 + 4 =Input batch function with electronic switch (NPN) with selection input
„pulse“ at configuration / batch (
Chapter 10.3.15 ‘Configuration / Batch’
PIN
Assignment
1
5 V, DC
2
Relay input
4
GND (┴)
or
3 + 4 = Input batch function with potential-free contact with selection input
„metering lock“ at configuration / batch (
Chapter 10.3.15 ‘Configuration / Batch’
PIN
Assignment
3
Relay input
4
GND (┴)
1 +3 + 4 = Input batch function with electronic switch (NPN) with selection input
„metering lock“ at configuration / batch (
Chapter 10.3.15 ‘Configuration / Batch’
PIN
Assignment
1
5 V, DC
3
Relay input
4
GND (┴)
Device installation
42
417101442 Rev. 12-02.2019
Summary of Contents for Elados EMP KKS E60
Page 2: ......
Page 123: ...14 2 Abmessungen Abb 89 Abmessungen Technische Daten 121 417101442 Rev 12 02 2019 ...
Page 135: ......
Page 258: ...14 2 Dimensions Fig 90 Dimensions Technical Specifications 122 417101442 Rev 12 02 2019 ...
Page 393: ...14 2 Dimensions Fig 93 Dimensions Données techniques 123 417101442 Rev 12 02 2019 ...
Page 405: ......