![background image](http://html.mh-extra.com/html/eaton/cooper-power-series/cooper-power-series_installation-operation-and-maintenance-manual_524277081.webp)
Table 10 . Function codes (continued)
Parameter
Unit of
Measure
Security Level
Default Value
Key Entry Limit
To Read
To Write
To Reset
Low
High
132 Average Minimum
Tap Position
XX
MM-DD-YYYY HH:MM:SS
---
View
NA
NA
NA
NA
NA
•The instantaneous metering display of the average minimum tap position for all phases when
in multi-phase operation.
•This is reset to zero by pressing ENTER and then ENTER again to confirm.
133 Total kVA Load
XXXX.X kVA
kVA
View
NA
NA
NA
NA
NA
•The instantaneous metering display of the sum of the apparent power for all phases when
in multi-phase operation.
133 Total kW Load
XXXX.X kW
kW
View
NA
NA
NA
NA
NA
•An instantaneous metering display of the sum of the real power for all phases when in
multi-phase operation.
133 Total kvar Load
XXXX.X kvar
kvar
View
NA
NA
NA
NA
NA
•An instantaneous metering display of the sum of the reactive power for all phases when in
multi-phase operation.
134 Fwd Load Current
Real High
XXX.X Amps
MM-DD-YYYY HH:MM:SS
Amps
View
NA
Operate
Reset*
NA
NA
•Demand metering high value for the real portion of the current for forward power flow
with date and time of earliest occurrence.
•This is reset to zero by pressing ENTER and then ENTER again to confirm.
134 Fwd Load Current
Real Low
XXX.X Amps
MM-DD-YYYY HH:MM:SS
---
View
NA
NA
NA
NA
NA
•Demand metering low value for the real portion of the current for forward power flow with
date and time of earliest occurrence.
•This is reset to zero by pressing ENTER and then ENTER again to confirm.
134 Fwd Load Current
Real Present
XXX.X Amps
---
View
NA
NA
NA
NA
NA
•Demand metering present value for the real portion of the current for forward power.
134 Fwd Load Current
Reactive High
XXX.X Amps
MM-DD-YYYY HH:MM:SS
Amps
View
NA
Operate
Reset*
NA
NA
•Demand metering high value for the reactive portion of the current for forward power flow
with date and time of earliest occurrence.
•This is reset to zero by pressing ENTER and then ENTER again to confirm.
134 Fwd Load Current
Reactive Low
XXX.X Amps
MM-DD-YYYY HH:MM:SS
---
View
NA
NA
NA
NA
NA
•Demand metering low value for the reactive portion of the current for forward power flow
with date and time of earliest occurrence.
•This is reset to zero by pressing ENTER and then ENTER again to confirm.
75
INSTALLATION, OPERATION, AND MAINTENANCE INSTRUCTIONS
MN225003EN April 2018
CL-7 Voltage Regulator Control