Figure 34 . Loop configured system with Co-Gen facility . Tie switch is open; stiff bus on the source bushings of the
regulators and true current flow from source bushing to load bushing .
Figure 35 . Loop configured system with Co-Gen facility . Tie switch is closed . Stiff bus on the load bushing of voltage
regulator A with true current flow from load to source . Stiff bus on the source bushing of voltage regulator B with
true current flow from source to load .
132
INSTALLATION, OPERATION, AND MAINTENANCE INSTRUCTIONS
MN225003EN April 2018
CL-7 Voltage Regulator Control