C H A P T E R 2
Dyno Installation
Above Ground Model 250i Motorcycle Dynamometer Installation Guide
2-10
DYNO INSTALLATION
This section will walk you through removing the dyno from the crate and installing the
dyno in your dyno room.
R
EMOVING
THE
D
YNO
FROM
THE
C
RATE
You will need to provide equipment capable of lifting a minimum of 1,133.98 kg
(2,500 lbs.) to lift the dyno off the crate and into position in your dyno room. You will
also need a pair of straps capable of supporting the same weight. Dynojet recommends
using a single loop style strap.
1
Remove the four lag bolts and washers securing the dyno to the crate base using a
9/16-inch socket, open or box end wrench.
2
The pickup card may be taped to the lifting eye. Remove the pickup card and set it
aside.
Figure 2-5: Remove the Dyno from the Crate Base
bolt and washer not
visible from this view
lifting eye
bolt and washer
bolt and washer
lifting eye
bolt and washer