2-1
Above Ground Model 250i Motorcycle Dynamometer Installation Guide
C
H A P T E R
2
D
YNO
I
NSTALLATION
This chapter will walk you through unpacking and installing the dynamometer. To
ensure safety and accuracy in the procedures, perform the procedures as they are
described.
This chapter is divided into the following categories:
• Unpacking and Inspecting the Dyno, page 2-2
• Dyno Installation, page 2-10
• Battery Installation, page 2-13
• Pickup Card Installation, page 2-14
• Eddy Current Brake Installation, page 2-15
• Secure the Dyno and Brake Module to the Floor, page 2-25
• Support Arm and Monitor Tray Installation, page 2-26
• Cable Routing, page 2-28
• Tire Carriage Installation, page 2-38
• Side and Top Cover Installation, page 2-42
• Load Cell Calibration, page 2-45