C H A P T E R 2
Unpacking and Inspecting the Dyno
Above Ground Model 250i Motorcycle Dynamometer Installation Guide
2-2
UNPACKING AND INSPECTING THE DYNO
When you receive your dyno, examine the exterior of the shipping container for any
visible damage. If damage is detected at this stage, contact the shipper or Dynojet
before proceeding.
Use the following steps to unload your dyno. You will need to provide equipment
capable of lifting a minimum of
1,133.98 kg (2,500 lbs.)
to move the crated dyno into
position in your dyno room. Move the crated dyno to a clear area near your dyno
room.
1
Using a pry bar and a hammer, remove the top and sides of the crate.
2
Inspect the exterior of the dyno for any indications of damage. Report any damage
immediately.
3
Remove the tire carriage. The tire carriage is fastened to the bottom of the crate.
4
Remove the support arm. The support arm is fastened to the bottom of the crate.
Refer to“Support Arm and Monitor Tray Installation” on page 2-26 for more
information.
Figure 2-1: Remove the Tire Carriage and Support Arm from the Crate
D 036
C
tire carriage
support arm