F 4
F_E
B
34_VB340
_05.
08_G
B.
fm
4-
1
8
4
Maintenance intervals - electric heating system
A
All times given are the maximum permissible maintenance intervals. For aggravat-
ed conditions of use, shorter intervals must be applied!
For the maintenance intervals and maintenance work required for the finisher, refer
to the operating instructions for the finisher.
Interval
Maintenance point
Note
10
50
10
0
25
0
50
0
1000 /
ann
u
a
lly
2000
/ ever
y 2
year
s
If
nec
essa
ry
q
- Check insulation monitoring
Before
starting work
A
Note national reg-
ulations on check-
ing and inspection
intervals!
- Electrical system check by a
specialist electrician
Maintenance
q
Maintenance during running-in period
g
Summary of Contents for Svedala Demag EB 34 Series
Page 2: ...VALUE QUALITY THE ORIGINAL Your Authorized Dynapac Dealer...
Page 14: ......
Page 16: ......
Page 70: ......
Page 87: ...F 17 F_EB34_VB340_05 08_GB fm 17 18 11 Test certificates 11 1 Electric screed heating system...
Page 88: ......