4.4
Commissioning and checking the
heating system
A
In order to reach the required tempera-
ture, the heating system should be
switched on approx. 15 - 20 minutes be-
fore the start of paving.
- Switch on the paver's engine.
- Switch on heating system ON / OFF
switch (1).
The heating system is activated and the
heating process begins.
During the heating process, the individu-
al screed parts' heating systems' indica-
tor lamps (2) light up.
Once the set temperature has been
reached, the indicator lamps go out one
after another.
Once all screed parts have reached the
desired temperature, paving operation
may begin.
If additional heating occurs during pav-
ing operation, this is indicated by the in-
dicator lamps (2).
A
The heating system indicator lamps in the control and monitoring unit (3) can also be
observed.
Schalttafel_340E.wmf
3
1
2
Summary of Contents for Svedala Demag EB 34 Series
Page 2: ...VALUE QUALITY THE ORIGINAL Your Authorized Dynapac Dealer...
Page 14: ......
Page 16: ......
Page 70: ......
Page 87: ...F 17 F_EB34_VB340_05 08_GB fm 17 18 11 Test certificates 11 1 Electric screed heating system...
Page 88: ......