D 13
D_E3
4_VB340_
05.
08_G
B.
fm
13-
2
6
- 01.
01.
07
3.8
Switching off the heater
After work has been completed, or when
the heater is no longer required:
- Switch off the On/Off switch (8) in the
switch cabinet.
- Close the quick action valves and both
bottle valves (30).
m
If these valves are not closed, there is a
danger of fire and explosion due to the
possible escape of uncombusted gas!
Always close the valves during breaks
and after work has been completed!
3.9
Exchanging the gas bottles
- Check whether the quick action valves
and both bottle valves (30) are closed.
- Unscrew the gas hoses.
- Screw the protective caps for the bot-
tle valves onto the gas bottles.
- Screw pressure reducer onto the
available mounting bracket.
f
Gas bottles that are full or not completely
emptied are under pressure.
Therefore, make sure that bottles with
their protective valve caps removed are
protected from severe impact (particu-
larly in the area of the valves or on the
valves themselves)!
- Connect new gas bottles (see section 3.4, „Connection and leak test“).
GHeiz_340.cdr
8
Gasflas.tif
30
Summary of Contents for Svedala Demag EB 34 Series
Page 2: ...VALUE QUALITY THE ORIGINAL Your Authorized Dynapac Dealer...
Page 14: ......
Page 16: ......
Page 70: ......
Page 87: ...F 17 F_EB34_VB340_05 08_GB fm 17 18 11 Test certificates 11 1 Electric screed heating system...
Page 88: ......