D 17
D_E3
4_VB340_
05.
08_G
B.
fm
17-
2
6
- 01.
01.
07
4.3
Isolation monitor
The function of the protective insulation
monitoring measure must be checked
every day before starting work.
A
This check only checks the function of
the insulation monitor, not whether an in-
sulation fault has occurred on the heat-
ing sections or consumers.
- Start the paver's engine.
- Switch heating system switch (1)
to ON.
- Press test button (2).
- The indicator lamp integrated into the
test button signals „insulation fault“
- Press reset button (3) for at least 3
sec. to delete the simulated fault.
- The indicator lamp goes out.
f
If the test is conducted successfully,
work may be undertaken with the screed
and external consumers may be used.
If the „insulation fault“ indicator lamp displays a fault even before the test button is
pressed or if no fault is displayed during the simulation, work must not be undertaken
with the screed or with connected, external equipment.
f
The screed and equipment must be checked or repaired by a specialist electri-
cian. Only then may work again be undertaken with the screed and equipment.
f
Danger due to electrical voltage
f
Non-adherence to the safety precautions and safety regulations
when operating the electric screed heating system leads to a
risk of electric shock.
Danger to life!
All maintenance and repair work on the screed's electrical system may be car-
ried out by a specialist electrician only.
Schalttafel_EB5075_neu.wmf
1
3
2
Summary of Contents for Svedala Demag EB 34 Series
Page 2: ...VALUE QUALITY THE ORIGINAL Your Authorized Dynapac Dealer...
Page 14: ......
Page 16: ......
Page 70: ......
Page 87: ...F 17 F_EB34_VB340_05 08_GB fm 17 18 11 Test certificates 11 1 Electric screed heating system...
Page 88: ......