E 6
E_EB3
4_VB340
__05.
08_G
B.
fm
-14 02-
05.
08
3
Extending the screed
A
An extension part (width of 350 mm) can be fitted on either side! This produces a
maximum operating width of 4.1m.
Before the extension parts can be fitted, the following steps must be undertaken:
3.1
Removing side shields
- Remove clip (1) for securing swing le-
ver axis from inside of screed body.
Also on outside of side shield:
- Remove folding pin (2) from pivot (3).
- Pull splint (4) out of clip (5).
- Take off hand-operated crank.
- Pull side shield with swing lever axis
off extendable part.
Schildmon_340awmf
1
Schildmon_340b.wmf
5
4
2
3
Summary of Contents for Svedala Demag EB 34 Series
Page 2: ...VALUE QUALITY THE ORIGINAL Your Authorized Dynapac Dealer...
Page 14: ......
Page 16: ......
Page 70: ......
Page 87: ...F 17 F_EB34_VB340_05 08_GB fm 17 18 11 Test certificates 11 1 Electric screed heating system...
Page 88: ......