E 2
E_EB3
4_VB340
__05.
08_G
B.
fm
-14 02-
05.
08
2
General assembly
2.1
Fitting screed to finisher
- Lower screed onto a suitable base
(square pieces of wood etc.) and drive
the finisher in reverse to just in front of
the screed.
Lower crossbeams and position so
that welded-on pivot of fulcrum point
on crossbeam (1) can be guided into
the relevant hole in the screed body.
Use screw and washer to secure ful-
crum point inside screed body.
To assemble further, the following steps
must be undertaken on both cross-
beams:
- Fit guide bolt (2) and spacer sleeve
(2a) between crossbeam and longitu-
dinal slot of screed guidance and use
washer (2b) and self-locking nut (2c)
to secure that this produces perfect
guidance and a good degree of free-
dom to move.
- Use eye of turn buckle (3a) to fit retain-
ing bolt (3) onto crossbeam to set
screed positioning angle and fit nut
(3b) provided for this purpose.
- Fit screw (4) with indicator of screed
positioning angle (4a), with washer
(4b) and self-locking nut (4c) onto
crossbeam to provide a good level of
movement.
Holm_Bohle340.wmf
1
Holm_Bohle340_2.wmf
2
2
2a
2b
3
3
3b
3a
4
4a
4
4b
4c
2c
Summary of Contents for Svedala Demag EB 34 Series
Page 2: ...VALUE QUALITY THE ORIGINAL Your Authorized Dynapac Dealer...
Page 14: ......
Page 16: ......
Page 70: ......
Page 87: ...F 17 F_EB34_VB340_05 08_GB fm 17 18 11 Test certificates 11 1 Electric screed heating system...
Page 88: ......