
SapIP – IRT Instruction Manual 1/23/2017
Page 39
Dynamax, Inc.
-
Step Eight:
o
Highlight the new frame from “Send frame” window, click “Send selected frame” to exe-cute.
o
“Frames log” window shows “Transmit Request” and “Transmit Status”. Then wait for new data.
o
Note: from the screen capture on the left, it will take some times for IRT node to adjust to the new
interval
-
Step Nine:
Repeat Step 4 through 8 for additional IRT nodes.