
SapIP – IRT Instruction Manual 1/23/2017
Page 18
Dynamax, Inc.
-
Lastly, the assembly and mounting procedures can begin for the high gain antenna and the IRT.
2.2.1
Mounting the SapIP-IRT
-
The first objective towards correctly fastening the SapIP-IRT to the vertical pole is to locate a
place on the pipe where one wishes to mount the IRT.
o
Note: Be sure to allow 3-4” inches from the end of the pipe so one has room to clamp the
IRT 2” EPS conduit hanger.
-
If not done so already, one will need to drill a hole through the pipe (vertically) using a 5/16”
(8mm) drill bit.
-
After this is complete, one can grab a 5/16” hex-bolt from the mentioned set of IRT materials
and slide a washer on it. Grab the 2” EPS conduit hanger and place it with the opening facing
downward. The top of the hanger has a place one can slide the bolt through.
-
Place it through the sensor cross arm or the vertical pole. Screw in a hex-head nut on top of a
washer.
-
Place the IRT through the hanger and insert the ¼ x 1-1/2” bolt to close the hanger, which will
grasp the IRT. This will keep it firmly in place throughout the duration it is in the field. An ¼
x 1-1/2 bolt will need to be fastened within the hole at the
red arrow
.
We recommend the pole is fastened to the
fence post with hex bolt, lock washers and
nut as shown. Drill additional 5/16” holes
in the pipe to extend the pole higher if the
crop may be expected to grow. Additional
5/16” bolt and nuts will be supplied by
customer