
SapIP – IRT Instruction Manual 1/23/2017
Page 30
Dynamax, Inc.
8.1
Send Identification Command (aI!)
-
Response is “213DYNAMAX SP IRT100 36”. Thus will be, Address 2, then compatibility 13,
company Dynamax, then sensor model SP IRT, then version “100” , then serial number “ 36”. See
SDI-12_Specification_1.3_January_3_2012 section 4.4.2.
8.2
Start Measurement Command (aM!)
-
Table 9 – ttt = specified time will be 0.003 seconds, measurement nominal time is 2 seconds, two
values are returned. The response will be as follows: “a0032(CRLF)” then followed in two seconds
with the service request.
-
At this time, the measurement is
NOT
averaged. Instead it’s just like a single sample when using
the radio module. So the steps are: first the charger will be turned off, then the sensor is powered
up, and a single sample is taken and discarded. Lastly, after a delay another sample is taken and
recorded, then the sensor will be powered down and charging will be resumed. The whole process
takes 2 seconds. The FFT filters in the sensor will stabilize the measurements. See SDI-
12_Specification_1.3_January_3_2012 section 4.4.5.
8.3
Aborting Measurements is NOT Supported
-
CPU is fully engaged in the measurement and cannot sense a “break” command during the 2
second cycle. See SDI-12_Specification_1.3_January_3_2012 section 4.4.5.1.
8.4
Service Request (a<CR><LF>)
-
Feedback that the measurement is complete then returns 2 seconds after the measurement
command “a(CRLF)”. See SDI-12_Specification_1.3_January_3_2012 section 4.4.6.
8.5
Send Data Command (aD0! . . . aD9!)
-
The response will be the object temperature followed by the ambient temperature in one line. For
example: “a +22.04 +21.34(CRLF)”. See SDI-12_Specification_1.3_January_3_2012 section 4.4.8.
8.6
Requesting a Cyclic Redundancy Check (CRC)
-
If desired a CRC check can be added to a measurement response. The ‘Start Measurement’
command has a ‘C’ added which enables the CRC. As in “aMC!”, any subsequent send data
command( aD0!) will have a 16bit CRC added at the end. See SDI-
12_Specification_1.3_January_3_2012 section 4.4.12.