
SapIP – IRT Instruction Manual 1/23/2017
Page 17
Dynamax, Inc.
2.1.3
Hurricane Pole
-
A hurricane top rail pipe is the easiest mounting option, items which will be provided by
the customer.
-
Since the IRT comes with the necessary materials to mount it on a medium these bolts
require that it be mounted on a vertical pole a minimum of 1” in diameter (25 mm)
(Dynamax suggests a stainless steel 1 – 1/4” hurricane fence top rail pipe as shown in the
attached drawings).
-
A 5/16” sized drill bit will need to be used to create a place on the cross arm where a hex-
head bolt, washer, and nut can mount the IRT.
o
Note: Be sure to allow 3-4” inches from the end of the pipe so one has room to clamp the
antenna’s hanger.
2.1.4
Fence Post
-
The next part of this assembly, a barbed wire fence post is provided by the customer.
-
Prepare the fence post by drilling a hole through the pipe (vertically) using a 5/16” (8mm)
drill bit.
-
Be certain that the fence post is secure within the ground and provides a means that will
allow it to fasten to the vertical cross-arm.
2.2
Installation
-
Installing the SapIP-IRT should begin with having a pre-existing fence post already firmly planted
in the ground.
-
The customer must next securely fasten the hurricane pole to the fence post. It is up to the client in
regards to how this is achieved; however, the connection will need to be firm enough to hold the
pole securely in place for the duration of time it is in the field. An example of the finished pole and
fence post attachment can be observed below.