Maintenance
4-23
6.
Dismount all the compressed air hoses for the
air shafts on the right side of the rolls: Push the
lock ring of the quick release couplings
upwards to release the air hoses.
7.
This overview shows correct threading of the
nonwoven, PET and waste.
Follow the steps below when threading.
8.
Lead the PET foil below the roller (A) and back
above the PET roll, and out of the processor as
shown.
9.
Lead the nonwoven below the roller (A) and
back above the PET roll, and out of the
processor as shown.
January, 2020
Operation Manual
|
Cyrel FAST 2000TD
Summary of Contents for Cyrel FAST 2000TD
Page 37: ...Operation procedures 2 19 Blank January 2020 Operation Manual Cyrel FAST 2000TD...
Page 38: ...3 0 Panel overview Panel overview Operation Manual Cyrel FAST 2000TD January 2020...
Page 49: ...Control panel 3 11 Menu diagram January 2020 Operation Manual Cyrel FAST 2000TD...
Page 86: ...Operation Manual Cyrel FAST 2000TD January 2020...
Page 106: ...B 14 Appendix B Blank Operation Manual Cyrel FAST 2000TD January 2020...