Original Operating Instructions
Platform SCP
Start-up phases
59
999805802 - 03/2016
Mounting the enclosure elements to
the facade profiles
➤
Attach the crane suspension tackle to the lifting rings
on the enclosure element.
➤
Crane-lift the enclosure element and guide it towards
the Facade profile HE-A180 with the aid of tag-lines.
➤
Clamp the pre-assembled enclosure elements to the
facade profiles above the platform decking.
➤
Detach the crane suspension tackle from the enclo-
sure element.
➤
Remove the Enclosure SCP lifting rings.
➤
Clamp further enclosure elements to the facade pro-
files in the same way.
Note:
The top enclosure element is not mounted until later.
H
Enclosure SCP lifting ring
I
Enclosure element
Follow the directions in the 'Enclosure SCP lift-
ing ring' Operating Instructions!
B
Facade profile HE-A180
J
Enclosure clamp SCP
92865-201-03
I
H
98058-408-06
B
J
J
B
Facade profile HE-A180
G
Platform decking (Raw sheet 3-S 38mm)
I
Enclosure element
98058-416-07
I
B
G
Summary of Contents for Platform SCP
Page 2: ...2 999805802 03 2016 Original Operating Instructions Platform SCP ...
Page 3: ...Original Operating Instructions Platform SCP 3 999805802 03 2016 ...
Page 31: ...Original Operating Instructions Platform SCP Anchoring on the structure 31 999805802 03 2016 ...
Page 61: ...Original Operating Instructions Platform SCP Start up phases 61 999805802 03 2016 ...
Page 114: ...114 999805802 03 2016 Design variants Original Operating Instructions Platform SCP ...