![Doka Platform SCP Original Operating Instructions / Instructions For Assembly And Use Download Page 45](http://html.mh-extra.com/html/doka/platform-scp/platform-scp_original-operating-instructions-instructions-for-assembly-and-use_2516579045.webp)
Original Operating Instructions
Platform SCP
Start-up phases
45
999805802 - 03/2016
➤
Remove the D50 distribution bolt and lower the Ver-
tical profile FRQ 120 down to the ground.
The following is included with the Vertical profile
FRQ
120:
▪
3 distribution bolts D50
▪
3 cotter pins 6.3x90
Positioning the formwork
➤
Prepare squared timbers for the correct operational
height along the entire length of the formwork.
➤
Attach the lifting chain to the lifting-brackets on the
pre-assembled formwork.
➤
Lift in the formwork elements and secure them
against tip-over.
H
Distribution bolt D50
I
Vertical profile FRQ 120
J
Squared timber (height = project-specific)
98058-429
-01
I
H
98058-426-03
J
Summary of Contents for Platform SCP
Page 2: ...2 999805802 03 2016 Original Operating Instructions Platform SCP ...
Page 3: ...Original Operating Instructions Platform SCP 3 999805802 03 2016 ...
Page 31: ...Original Operating Instructions Platform SCP Anchoring on the structure 31 999805802 03 2016 ...
Page 61: ...Original Operating Instructions Platform SCP Start up phases 61 999805802 03 2016 ...
Page 114: ...114 999805802 03 2016 Design variants Original Operating Instructions Platform SCP ...