Original Operating Instructions
Platform SCP
Start-up phases
39
999805802 - 03/2016
Working platform with no base beams
(suspended platform)
▪
The working platform is suspended exclusively from
the girder grille.
Working platform with two base beams
▪
For the transfer of horizontal loads
▪
4 Vertical profiles 150 support the girder grille
Note:
Working platforms with two base beams can be assem-
bled with one or two hydraulic cylinders, as necessary.
Two hydraulic cylinders and two lower base beams are
used when the following requirements apply:
▪
For positioning a concrete placing boom
▪
If statically required
D
Suspension profile FRQ 120/8 .....m
E
Girder grille
D
E
98058-433-03
A
Upper base beam
B
Lower base beam
C
Vertical profile 150/.../S355
98058-433-02
A
A
B
C
C
C
C
Summary of Contents for Platform SCP
Page 2: ...2 999805802 03 2016 Original Operating Instructions Platform SCP ...
Page 3: ...Original Operating Instructions Platform SCP 3 999805802 03 2016 ...
Page 31: ...Original Operating Instructions Platform SCP Anchoring on the structure 31 999805802 03 2016 ...
Page 61: ...Original Operating Instructions Platform SCP Start up phases 61 999805802 03 2016 ...
Page 114: ...114 999805802 03 2016 Design variants Original Operating Instructions Platform SCP ...