![Doka Platform SCP Original Operating Instructions / Instructions For Assembly And Use Download Page 132](http://html.mh-extra.com/html/doka/platform-scp/platform-scp_original-operating-instructions-instructions-for-assembly-and-use_2516579132.webp)
132
999805802 - 03/2016
Anchoring on the structure - Lifting unit attached on one side
Original Operating Instructions
Platform SCP
Opposite anchoring points
Note:
If the wall thickness is less than twice the installation
depth of the Stop anchors, opposite anchoring points
must be located at an offset to one another.
Plan view
a ... min. 100 mm, if c < 2 x b
b ... Installation depth
c ... Wall thickness
Anchor points with no offset
Anchor points with no offset are prepared using the
Stop anchor double-ended 20.0
.
Positioning point
Suspension point
a ... 30 - 71
cm
b ... order length = wall thickness
a - 2
x concrete cover
c
c ... concrete cover 5.5
cm
Risk of formwork falling off if two cones are
fitted opposite one another and joined with
a tie rod.
Unscrewing the anchoring component on one
side may cause the anchoring point on the
opposite side to shear off.
➤
Every suspension point must have its own
separate anchorage.
Exception: Suspension points prepared with a
Stop anchor double-ended 20.0
a
98037-281-01
b
c
98037-281-02
A
Universal climbing cone 20.0
B
Sealing sleeve K 20.0 (expendable anchoring component)
C
Stop anchor double-ended
20.0
..cm
90
(expendable
anchoring
component)
D
Packing plate (e.g. Dokaplex 15 mm)
E
Cone screw B 7cm
WARNING
In walls that are less than 42 cm thick
, the
Stop anchor double-ended 20.0 ..cm 90 has a
much lower load-bearing capacity than the
Stop anchor 20.0 17.5cm
55.
➤
Revised static calculation is required here.
➤
Where high tensile forces occur, locate extra
reinforcement steel as statically required.
TR1006-200-02
C
B
A
E
D
a
b
c
c
TR1006-200-03
C
B
A
E
Summary of Contents for Platform SCP
Page 2: ...2 999805802 03 2016 Original Operating Instructions Platform SCP ...
Page 3: ...Original Operating Instructions Platform SCP 3 999805802 03 2016 ...
Page 31: ...Original Operating Instructions Platform SCP Anchoring on the structure 31 999805802 03 2016 ...
Page 61: ...Original Operating Instructions Platform SCP Start up phases 61 999805802 03 2016 ...
Page 114: ...114 999805802 03 2016 Design variants Original Operating Instructions Platform SCP ...