![Doka Platform SCP Original Operating Instructions / Instructions For Assembly And Use Download Page 145](http://html.mh-extra.com/html/doka/platform-scp/platform-scp_original-operating-instructions-instructions-for-assembly-and-use_2516579145.webp)
Original Operating Instructions
Platform SCP
Start-up phases – Lifting unit attached on one side
145
999805802 - 03/2016
Suspended platform
➤
Pin the Suspension profiles FRQ
50
to
the
Multi-pur-
pose walings WS10 Top50 of the working platform
and secure the pins with spring cotters.
➤
Pin the Multi-purpose waling WS10 Top50 of the
suspended platform to the Suspension profiles
FRQ
50 and secure the pins with spring cotters.
☞
Important note:
➤
Do not secure the platforms to the lower
brackets.
C
Suspension profile FRQ
50
(project-specific)
E
Connecting pin 10cm
F
Spring cotter 5mm
G
Multi-purpose waling WS10
Top50
98058-405-10
F
G
E
C
C
Suspension profile FRQ
50
(project-specific)
E
Connecting pin 10cm
F
Spring cotter 5mm
G
Multi-purpose waling WS10
Top50
98058-424-01
E
G
F
C
A
Working platform
B
Suspended platform
98058-458-03
B
A
Summary of Contents for Platform SCP
Page 2: ...2 999805802 03 2016 Original Operating Instructions Platform SCP ...
Page 3: ...Original Operating Instructions Platform SCP 3 999805802 03 2016 ...
Page 31: ...Original Operating Instructions Platform SCP Anchoring on the structure 31 999805802 03 2016 ...
Page 61: ...Original Operating Instructions Platform SCP Start up phases 61 999805802 03 2016 ...
Page 114: ...114 999805802 03 2016 Design variants Original Operating Instructions Platform SCP ...