Original Operating Instructions
Platform SCP
Start-up phases
47
999805802 - 03/2016
➤
Bolt the girder grille to the Vertical profiles 150 with
threaded rods.
➤
Pre-tension the Clamping connections WU30 (see
the section headed 'Clamping connections for
assembling the girder grille').
Threaded-fastener material required for each Vertical
profile 150
▪
4 threaded rods M20
(length 750 mm, strength grade 8.8)
▪
8 washers 20 (EN ISO 7089)
▪
8 hexagon nuts M20, strength grade 8
(EN ISO 4032 / DIN 934)
Girder grille made up of several units
➤
Mount the bottom tension plate on the first part of the
grille-beam unit.
➤
Bolt the units of the girder grille to each other (see
the section headed 'Assembling the girder grille').
WARNING
➤
Do not detach the crane until the girder grille
is firmly bolted to the Vertical profiles 150.
B
Pre-assembled girder grille
C
Clamping plate WU30
D
Vertical profile 150
B
C
C
D
98058-422-12
The bottom tension plate serves as an assem-
bly stop-bar.
E
Tension plate U300
F
Grille connector U300
G
Packing plate
98058-425-01
98058-491-02
E
G
F
Summary of Contents for Platform SCP
Page 2: ...2 999805802 03 2016 Original Operating Instructions Platform SCP ...
Page 3: ...Original Operating Instructions Platform SCP 3 999805802 03 2016 ...
Page 31: ...Original Operating Instructions Platform SCP Anchoring on the structure 31 999805802 03 2016 ...
Page 61: ...Original Operating Instructions Platform SCP Start up phases 61 999805802 03 2016 ...
Page 114: ...114 999805802 03 2016 Design variants Original Operating Instructions Platform SCP ...