Start-up phases
Original Operating Instructions
Platform SCP
Start-up phases
Starting up
The modular design of the Platform SCP means that
many different combinations are possible.
Depending on the project, the actual design may thus
differ very greatly from the basic type described here.
➤
In these cases, you should discuss the assembly
procedure with your Doka technician.
➤
Follow the shop drawing / assembly plan.
Overview of working platforms
The below assembly procedure describes the following
three types of working platforms:
▪
Working platform with one base beam
▪
Working platform with no base beams (suspended
platform)
▪
Working platform with two base beams
Working platform with one base beam
▪
Typical standard application
▪
Girder grille is supported by 2 Vertical profiles
150
☞
Important note:
▪
A hard, flat, firm surface is needed!
▪
Prepare a sufficiently large assembly area.
☞
In order to explain the entire lifting sequence as
simply as possible, the repetitive actions
involved are described in detail in separate sec-
tions of this booklet.
The sections in question are:
▪
Mounting the latch-boxes (see 'Anchoring on
the structure').
▪
Closing the formwork (see 'Closing the form-
work').
▪
Striking (see 'Opening the formwork').
For instructions on tying and joining the form-
work elements, and on cleaning them and using
concrete release-agents, see the User Informa-
tion booklets 'Large-area formwork Top50' and
'Framed formwork Framax Xlife'.
WARNING
Falling hazard!
➤
Use personal fall arrest systems to protect
against fall hazards when working on
unsafeguarded drop-off edges (e.g. Doka
personal fall-arrest set).
A
Upper base beam
B
Lower base beam
C
Vertical profile 150/.../S355
98058-433-01
A
B
C
C
Summary of Contents for Platform SCP
Page 2: ...2 999805802 03 2016 Original Operating Instructions Platform SCP ...
Page 3: ...Original Operating Instructions Platform SCP 3 999805802 03 2016 ...
Page 31: ...Original Operating Instructions Platform SCP Anchoring on the structure 31 999805802 03 2016 ...
Page 61: ...Original Operating Instructions Platform SCP Start up phases 61 999805802 03 2016 ...
Page 114: ...114 999805802 03 2016 Design variants Original Operating Instructions Platform SCP ...