![Doka Platform SCP Original Operating Instructions / Instructions For Assembly And Use Download Page 143](http://html.mh-extra.com/html/doka/platform-scp/platform-scp_original-operating-instructions-instructions-for-assembly-and-use_2516579143.webp)
Original Operating Instructions
Platform SCP
Start-up phases – Lifting unit attached on one side
143
999805802 - 03/2016
Attaching the girder grille
➤
Mount the girder grille on the vertical scaffolds. (see
the 'Lifting units attached on both sides' version in
section headed 'Assembling the girder grille'.)
➤
Install the diagonal strut between bracket and girder
grille as per the final drawing or assembly drawing.
98058-461-01
Summary of Contents for Platform SCP
Page 2: ...2 999805802 03 2016 Original Operating Instructions Platform SCP ...
Page 3: ...Original Operating Instructions Platform SCP 3 999805802 03 2016 ...
Page 31: ...Original Operating Instructions Platform SCP Anchoring on the structure 31 999805802 03 2016 ...
Page 61: ...Original Operating Instructions Platform SCP Start up phases 61 999805802 03 2016 ...
Page 114: ...114 999805802 03 2016 Design variants Original Operating Instructions Platform SCP ...