![Doka Platform SCP Original Operating Instructions / Instructions For Assembly And Use Download Page 140](http://html.mh-extra.com/html/doka/platform-scp/platform-scp_original-operating-instructions-instructions-for-assembly-and-use_2516579140.webp)
140
999805802 - 03/2016
Start-up phases – Lifting unit attached on one side
Original Operating Instructions
Platform SCP
Erecting the working platform and the formwork
Pre-assembling the lower bracket
➤
Pin Bracket SCP cylinder connector B into the lower
Bracket SCP sand secure with Spring cotters 5mm.
➤
Pin the support roller of the lower bracket in the park-
ing position and secure the pin.
Pre-assembling the upper brackets
➤
Bolt the Bracket SCP strut connection to the upper
Bracket SCP.
Securing brackets to the structure
➤
Position the suspended platforms in the shaft.
➤
Install the Bracket SCP suspension shoes for the
next casting section.
➤
Remove the fixing plate from the Bracket SCP sus-
pension shoe.
Width-across 30
mm
A
Bracket SCP
B
Bracket SCP cylinder connector B
C
Support roller in parking position
A
Bracket SCP
D
Bracket SCP strut connection (project-specific)
98058-457-02
B
A
98058-457-03
C
98058-476-01
D
A
E
Bracket SCP suspension shoe
F
Fixing plate
98058-461-07
98058-460-02
E
F
Summary of Contents for Platform SCP
Page 2: ...2 999805802 03 2016 Original Operating Instructions Platform SCP ...
Page 3: ...Original Operating Instructions Platform SCP 3 999805802 03 2016 ...
Page 31: ...Original Operating Instructions Platform SCP Anchoring on the structure 31 999805802 03 2016 ...
Page 61: ...Original Operating Instructions Platform SCP Start up phases 61 999805802 03 2016 ...
Page 114: ...114 999805802 03 2016 Design variants Original Operating Instructions Platform SCP ...