![Doka Platform SCP Original Operating Instructions / Instructions For Assembly And Use Download Page 107](http://html.mh-extra.com/html/doka/platform-scp/platform-scp_original-operating-instructions-instructions-for-assembly-and-use_2516579107.webp)
Original Operating Instructions
Platform SCP
Dismantling
107
999805802 - 03/2016
Working platform with one base beam
➤
Dismount the working platform with one base beam
in the same way as the working platform with two
base beams.
Working platform with no base beams
(suspended platform)
➤
Attach the lifting chain to the suspended platform.
➤
Lift the suspended platform out of the shaft and set it
down on the ground.
➤
Dismount the latch-boxes and supports, working
from a suitable crane-cage.
98058-468
-03
98058-468-05
98058-468
-04
Summary of Contents for Platform SCP
Page 2: ...2 999805802 03 2016 Original Operating Instructions Platform SCP ...
Page 3: ...Original Operating Instructions Platform SCP 3 999805802 03 2016 ...
Page 31: ...Original Operating Instructions Platform SCP Anchoring on the structure 31 999805802 03 2016 ...
Page 61: ...Original Operating Instructions Platform SCP Start up phases 61 999805802 03 2016 ...
Page 114: ...114 999805802 03 2016 Design variants Original Operating Instructions Platform SCP ...