培训手册
Training Manual
操作前检查
Pre-operation Inspection
JCPT-HD/DC
www.cndingli.com
4-6
在平台控制器上(
At the Platform Controls
)
测试紧急停机(
Test Emergency Stop
)
17)
将平台红色紧急停机按钮推至“关”的位置。(
Push in the platform red Emergency Stop
button to the off position.
)
⊙
结果:所有功能都不会运行。(
Result: No functions should operate.
)
18)
将红色紧急停机按钮拔出至“开”的位置。(
Turn the red Emergency Stop button clockwise
to the on position.
)
⊙
结果:
LED
诊断读数装置指示灯将变亮。(
Result: The LED indicator light should come on.
)
测试喇叭(
Test the Horn
)
19)
按下喇叭按钮。(
Push the horn button.
)
⊙
结果:喇叭将会鸣响。(
Result: The horn should sound.
)
测试上升
/
下降功能和功能启用(
Test Function Enable and Up/Down Functions
)
20)
不要按住控制手柄上的功能启用按钮。(
Do not hold the function enable switch on the
control handle.
)
21)
按照蓝色箭头指示的方向缓慢移动控制手柄,然后再按照黄色箭头指示的方向移动。
(
Slowly
move the control handle in the direction indicated by the blue arrow, then in the direction
indicated by the yellow arrow.
)
⊙
结果:所有功能都不会运行。(
Result: No functions should operate.
)
22)
按下起升功能选择按钮。(
Press the lift function select button.
)
23)
按住控制手柄上的功能启用按钮。(
Press and hold the function enable switch on the control
handle.
)
24)
按照蓝色箭头指示的方向缓慢移动控制手柄。(
Slowly move the control handle in the
direction indicated by the blue arrow.
)
⊙
结果:平台应上升。坑洞保护装置应当展开。(
Result: The platform should raise. The pothole
guards should deploy.
)
25)
释放控制手柄。(
Release the control handle.
)
⊙
结果:平台应停止上升。(
Result: The platform should stop raising.
)
26)
按住功能启用按钮。按照黄色箭头指示的方向缓慢移动控制手柄。(
Press and hold the
function enable switch. Slowly move the control handle in the direction indicated by the
yellow arrow.
)
Summary of Contents for JCPT-HD/DC Series
Page 2: ......
Page 36: ......
Page 37: ...培训手册 Training Manual 操作 Operation JCPT HD DC www cndingli com 4 1 操作 Operation ...
Page 50: ......
Page 66: ......
Page 94: ......
Page 110: ......
Page 117: ...培训手册 Training Manual 常规保养 Daily Maintenance JCPT HD DC www cndingli com 10 7 ...
Page 118: ......