要考虑强风或阵风对平台的移动、电线的摆动及松弛的影响。
如果机器接触到带电的电线时,请远离机器。切断电源前,禁止地面或平台上的人员触摸或操作机
器。
有闪电或暴风雨时不要操作机器。
不要在焊接时将机器用作地线。
Allow for platform movement, electrical line sway or sag and beware of strong or gusty winds.
Keep away from the machine if it contacts energized power lines. Personnel on the ground or in
the platform must not touch or operate the machine until energized power lines are shut off.
Do not operate the machine during lightning or storms.
Do not use the machine as a ground for welding.
倾翻危险(
Tip-over Hazard
)
平台上的人员、设备和材料不得超过平台及延伸平台的最大承载量。
Occupants, equipment and materials must not exceed the maximum platform capacity or the
maximum capacity of the platform extension.
平台缩回
Platform retracted
平台延伸
Platform extended
仅延伸平台
仅限平台
Extension only Platform only
最大承载量(
Maximum capacity
)
— JCT0807HD / JCPT0807DC
最多容纳人员数(室内)
Maximum occupants (Indoor use)
2
人
最多容纳人员数(室外)
Maximum occupants (Outdoor use) 1
人
平台最大工作载荷
Platform allowable maximum load
230 kg
延伸平台最大工作载荷
Extension deck allowable maximum load
113 kg
最大承载量(
Maximum capacity
)
— JCPT0807GDC
最多容纳人员数(仅限室内使用)
Maximum occupants (Indoor use ONLY) 1
人
平台最大工作载荷
Platform allowable maximum load 230 kg
延伸平台最大工作载荷
Extension deck allowable maximum load 113 kg
Summary of Contents for JCPT-HD/DC Series
Page 2: ......
Page 36: ......
Page 37: ...培训手册 Training Manual 操作 Operation JCPT HD DC www cndingli com 4 1 操作 Operation ...
Page 50: ......
Page 66: ......
Page 94: ......
Page 110: ......
Page 117: ...培训手册 Training Manual 常规保养 Daily Maintenance JCPT HD DC www cndingli com 10 7 ...
Page 118: ......