培训手册
Training Manual
传感器设定及称重标定
Sensor Setting and Load Calibration
JCPT-HD/DC
www.cndingli.com
6-5
2.2
满载校验(
Full Load Calibration
)
1)
将机器上所有的急停开关处在一个打开的位置。(
Open all the emergency stop button.
)
2)
将机器降到底,且平台上有额定载荷的
110%
的重量。(
Start with 110% of the rated load
platform in the stowed position.
)
3)
把钥匙开关打到平台位置,这将防止平台升起当启动程序
被 输 入 地 面 控 制 器 。 (
Turn the key switch to the
“
Platform
”
position, this will prevent the platform from
rising while the start sequence is being entered on the
ground controller.
)
4)
拨动指拨开关,向下
5
次;向上
1
次;向下
5
次;向上
1
次;向下
5
次。(
Press the chassis toggle switch, 5
“
Downs
”;
1
“
Up
”;
5
“
Downs
”;
1
“
Up
”;
5
“
Downs
”
.
)
5)
以上步骤正确机器会自动进入标定过程,平台走完全程停在收拢状态,喇叭停止发声后,满载
校验完成。(
The above steps are correct the machine will go through an automated
calibration procedure with the full platform, the calibration process will be complete when the
platform is all the way down and the horn has stopped sounding.
)
Summary of Contents for JCPT-HD/DC Series
Page 2: ......
Page 36: ......
Page 37: ...培训手册 Training Manual 操作 Operation JCPT HD DC www cndingli com 4 1 操作 Operation ...
Page 50: ......
Page 66: ......
Page 94: ......
Page 110: ......
Page 117: ...培训手册 Training Manual 常规保养 Daily Maintenance JCPT HD DC www cndingli com 10 7 ...
Page 118: ......