JT920/JT920L - OPERATION
97
REMOVE/ADD PIPE BOX
JT920/JT920L - OPERATION
97
REMOVE/ADD PIPE BOX
Remove
1.
Remove lynch pins and pipe box pins (2, 3).
2.
Position lift plate assembly (1) into notches on pipe box arm
holes.
3.
Attach lifting device to ring on lift plate assembly.
4.
Remove pins (4).
5.
Move pipe box off of drill frame.
Load
1.
Move pipe box over pipeloader and lower into position.
2.
Install pins (4).
3.
Raise pipe off storage pins (5).
4.
Remove storage pins from pipe box.
5.
Lower pipe onto shuttles.
6.
Disconnect lifting device from lift plate assembly (1).
7.
Remove lift plate assembly from pipe box.
8.
Replace pipe box pins and lynch pins (2, 3).
Remove
1.
Remove lynch pins and pipe box pins (2, 3).
2.
Position lift plate assembly (1) into notches on pipe box arm
holes.
3.
Attach lifting device to ring on lift plate assembly.
4.
Remove pins (4).
5.
Move pipe box off of drill frame.
Load
1.
Move pipe box over pipeloader and lower into position.
2.
Install pins (4).
3.
Raise pipe off storage pins (5).
4.
Remove storage pins from pipe box.
5.
Lower pipe onto shuttles.
6.
Disconnect lifting device from lift plate assembly (1).
7.
Remove lift plate assembly from pipe box.
8.
Replace pipe box pins and lynch pins (2, 3).
Summary of Contents for JT920
Page 54: ...54 JT920 JT920L SAFETY SAFETY ALERTS 54 JT920 JT920L SAFETY SAFETY ALERTS...
Page 68: ...68 JT920 JT920L PREPARATION 68 JT920 JT920L PREPARATION...
Page 75: ...JT920 JT920L TRANSPORTATION 75 TOW JT920 JT920L TRANSPORTATION 75 TOW...
Page 76: ...76 JT920 JT920L TRANSPORTATION TOW 76 JT920 JT920L TRANSPORTATION TOW...
Page 167: ......
Page 168: ......
Page 169: ...JT920 JT920L 169 JT920 JT920L 169...