62
JT920/JT920L - PREPARATION
PLAN BORE PATH
62
JT920/JT920L - PREPARATION
PLAN BORE PATH
Minimum Setback
Setback is the distance from entry to horizontal. If setback is too
small, bend limits are exceeded and pipe can be damaged.
To determine the minimum setback for your required depth, use
chart in
APPENDIX
, section B. Find entry pitch you will be using,
then minimum setback.
A. Proper setback B. Setback too small
Minimum Setback
Setback is the distance from entry to horizontal. If setback is too
small, bend limits are exceeded and pipe can be damaged.
To determine the minimum setback for your required depth, use
chart in
APPENDIX
, section B. Find entry pitch you will be using,
then minimum setback.
A. Proper setback B. Setback too small
Summary of Contents for JT920
Page 54: ...54 JT920 JT920L SAFETY SAFETY ALERTS 54 JT920 JT920L SAFETY SAFETY ALERTS...
Page 68: ...68 JT920 JT920L PREPARATION 68 JT920 JT920L PREPARATION...
Page 75: ...JT920 JT920L TRANSPORTATION 75 TOW JT920 JT920L TRANSPORTATION 75 TOW...
Page 76: ...76 JT920 JT920L TRANSPORTATION TOW 76 JT920 JT920L TRANSPORTATION TOW...
Page 167: ......
Page 168: ......
Page 169: ...JT920 JT920L 169 JT920 JT920L 169...