106
JT920/JT920L - OPERATION
ASSEMBLE BACKREAM STRING
106
JT920/JT920L - OPERATION
ASSEMBLE BACKREAM STRING
3.
Tighten joint using scribe line technique to achieve proper
preload.
4.
Turn screw opposite way two turns to relieve pressure and
remove quick wrench components.
5.
Hand tighten EZ-Connect pin to pin-to-pin adapter.
6.
Attach quick wrench in join position.
7.
Tighten joint using scribe line technique to achieve proper
preload.
8.
Turn screw opposite way two turns to relieve pressure and
remove quick wrench components.
3.
Tighten joint using scribe line technique to achieve proper
preload.
4.
Turn screw opposite way two turns to relieve pressure and
remove quick wrench components.
5.
Hand tighten EZ-Connect pin to pin-to-pin adapter.
6.
Attach quick wrench in join position.
7.
Tighten joint using scribe line technique to achieve proper
preload.
8.
Turn screw opposite way two turns to relieve pressure and
remove quick wrench components.
Summary of Contents for JT920
Page 54: ...54 JT920 JT920L SAFETY SAFETY ALERTS 54 JT920 JT920L SAFETY SAFETY ALERTS...
Page 68: ...68 JT920 JT920L PREPARATION 68 JT920 JT920L PREPARATION...
Page 75: ...JT920 JT920L TRANSPORTATION 75 TOW JT920 JT920L TRANSPORTATION 75 TOW...
Page 76: ...76 JT920 JT920L TRANSPORTATION TOW 76 JT920 JT920L TRANSPORTATION TOW...
Page 167: ......
Page 168: ......
Page 169: ...JT920 JT920L 169 JT920 JT920L 169...