JT920/JT920L - OPERATION
91
DRILL FIRST PIPE
JT920/JT920L - OPERATION
91
DRILL FIRST PIPE
Break Joint at Saver Sub
1.
When joint flats are aligned with front wrench, release
joystick.
2.
Engage front wrench.
3.
Rotate spindle clockwise slowly until wrench flats engage
pipe flats.
4.
Reverse rotation and slowly move carriage back as threads
unscrew.
IMPORTANT:
Move carriage back only after threads have
unscrewed completely to protect threads.
5.
Stop rotation and move carriage to back of frame.
Break Joint at Saver Sub
1.
When joint flats are aligned with front wrench, release
joystick.
2.
Engage front wrench.
3.
Rotate spindle clockwise slowly until wrench flats engage
pipe flats.
4.
Reverse rotation and slowly move carriage back as threads
unscrew.
IMPORTANT:
Move carriage back only after threads have
unscrewed completely to protect threads.
5.
Stop rotation and move carriage to back of frame.
Summary of Contents for JT920
Page 54: ...54 JT920 JT920L SAFETY SAFETY ALERTS 54 JT920 JT920L SAFETY SAFETY ALERTS...
Page 68: ...68 JT920 JT920L PREPARATION 68 JT920 JT920L PREPARATION...
Page 75: ...JT920 JT920L TRANSPORTATION 75 TOW JT920 JT920L TRANSPORTATION 75 TOW...
Page 76: ...76 JT920 JT920L TRANSPORTATION TOW 76 JT920 JT920L TRANSPORTATION TOW...
Page 167: ......
Page 168: ......
Page 169: ...JT920 JT920L 169 JT920 JT920L 169...