JT920/JT920L - OPERATION
113
REMOVE PIPE
JT920/JT920L - OPERATION
113
REMOVE PIPE
16. Move carriage to back of drill frame. Pipe will automatically
be loaded into selected row in pipe box.
Turning shaft will kill you or crush
arm or leg. Stay away.
IMPORTANT:
If shuttles do not retract, pipe may not be
positioned correctly.
•
Adjust pipe so that both lights
(A, B) are on.
•
Press pipe shuttle switch to
manually retract shuttles. This
will restart the automation cycle.
17. Attach next pipe to saver sub.
•
Use dual speed carriage control
and move carriage forward until saver sub touches pipe.
•
Rotate spindle and move carriage forward just enough to
allow pipe to screw into saver sub. Joint should only be
tight enough to prevent leaking.
18. Disengage front wrench to release pipe.
om0134c.eps
16. Move carriage to back of drill frame. Pipe will automatically
be loaded into selected row in pipe box.
Turning shaft will kill you or crush
arm or leg. Stay away.
IMPORTANT:
If shuttles do not retract, pipe may not be
positioned correctly.
•
Adjust pipe so that both lights
(A, B) are on.
•
Press pipe shuttle switch to
manually retract shuttles. This
will restart the automation cycle.
17. Attach next pipe to saver sub.
•
Use dual speed carriage control
and move carriage forward until saver sub touches pipe.
•
Rotate spindle and move carriage forward just enough to
allow pipe to screw into saver sub. Joint should only be
tight enough to prevent leaking.
18. Disengage front wrench to release pipe.
om0134c.eps
Summary of Contents for JT920
Page 54: ...54 JT920 JT920L SAFETY SAFETY ALERTS 54 JT920 JT920L SAFETY SAFETY ALERTS...
Page 68: ...68 JT920 JT920L PREPARATION 68 JT920 JT920L PREPARATION...
Page 75: ...JT920 JT920L TRANSPORTATION 75 TOW JT920 JT920L TRANSPORTATION 75 TOW...
Page 76: ...76 JT920 JT920L TRANSPORTATION TOW 76 JT920 JT920L TRANSPORTATION TOW...
Page 167: ......
Page 168: ......
Page 169: ...JT920 JT920L 169 JT920 JT920L 169...