JT920/JT920L - PREPARATION
63
PLAN BORE PATH
JT920/JT920L - PREPARATION
63
PLAN BORE PATH
Minimum Depth
Because pipe must be bent gradually, entry pitch and bend limits
determine how deep the pipe will be when it reaches horizontal.
Use the chart in
APPENDIX
, section B, to determine minimum
depth for your job.
To reduce depth, reduce entry pitch. To increase depth, increase
entry pitch and setback.
To find setback and entry pitch that will take you to desired depth,
locate depth on chart in
APPENDIX
, section B. Then find
corresponding setback and entry pitch.
Minimum Depth
Because pipe must be bent gradually, entry pitch and bend limits
determine how deep the pipe will be when it reaches horizontal.
Use the chart in
APPENDIX
, section B, to determine minimum
depth for your job.
To reduce depth, reduce entry pitch. To increase depth, increase
entry pitch and setback.
To find setback and entry pitch that will take you to desired depth,
locate depth on chart in
APPENDIX
, section B. Then find
corresponding setback and entry pitch.
Summary of Contents for JT920
Page 54: ...54 JT920 JT920L SAFETY SAFETY ALERTS 54 JT920 JT920L SAFETY SAFETY ALERTS...
Page 68: ...68 JT920 JT920L PREPARATION 68 JT920 JT920L PREPARATION...
Page 75: ...JT920 JT920L TRANSPORTATION 75 TOW JT920 JT920L TRANSPORTATION 75 TOW...
Page 76: ...76 JT920 JT920L TRANSPORTATION TOW 76 JT920 JT920L TRANSPORTATION TOW...
Page 167: ......
Page 168: ......
Page 169: ...JT920 JT920L 169 JT920 JT920L 169...