JT920/JT920L - SETUP
83
ASSEMBLE DRILL STRING
JT920/JT920L - SETUP
83
ASSEMBLE DRILL STRING
3.
Tighten joint.
4.
Turn screw opposite way two turns to relieve pressure and
remove quick wrench components.
5.
Hand tighten EZ-Connect pin (5)
to pin-to-pin adapter (4).
6.
Attach quick wrench in join
position.
7.
Tighten joint using scribe line
technique to achieve proper
preload.
8.
Turn screw opposite way two
turns to relieve pressure and
remove quick wrench
components.
Option B
1.
Apply tool joint compound to threads and hand tighten pin to
EZ-Connect pin adapter (6).
2.
Attach quick wrench in join position.
3.
Tighten joint using scribe line technique to achieve proper
preload.
4.
Turn screw opposite way two turns to relieve pressure and
remove quick wrench components.
3.
Tighten joint.
4.
Turn screw opposite way two turns to relieve pressure and
remove quick wrench components.
5.
Hand tighten EZ-Connect pin (5)
to pin-to-pin adapter (4).
6.
Attach quick wrench in join
position.
7.
Tighten joint using scribe line
technique to achieve proper
preload.
8.
Turn screw opposite way two
turns to relieve pressure and
remove quick wrench
components.
Option B
1.
Apply tool joint compound to threads and hand tighten pin to
EZ-Connect pin adapter (6).
2.
Attach quick wrench in join position.
3.
Tighten joint using scribe line technique to achieve proper
preload.
4.
Turn screw opposite way two turns to relieve pressure and
remove quick wrench components.
Summary of Contents for JT920
Page 54: ...54 JT920 JT920L SAFETY SAFETY ALERTS 54 JT920 JT920L SAFETY SAFETY ALERTS...
Page 68: ...68 JT920 JT920L PREPARATION 68 JT920 JT920L PREPARATION...
Page 75: ...JT920 JT920L TRANSPORTATION 75 TOW JT920 JT920L TRANSPORTATION 75 TOW...
Page 76: ...76 JT920 JT920L TRANSPORTATION TOW 76 JT920 JT920L TRANSPORTATION TOW...
Page 167: ......
Page 168: ......
Page 169: ...JT920 JT920L 169 JT920 JT920L 169...