JT920/JT920L - OPERATION
95
ADD PIPE
JT920/JT920L - OPERATION
95
ADD PIPE
8.
Press top of drilling unit throttle switch until engine is at full
throttle.
9.
Adjust fluid pressure.
•
Press and hold top of fluid pump switch until pipe fills and
fluid pressure begins to rise.
•
Adjust fluid flow control to set pressure to appropriate level.
Do not exceed maximum pump setting.
10. Rotate spindle clockwise, full speed.
11. Move carriage forward slowly. Adjust rotation speed control
according to bit size and soil conditions.
12. Locate drill head at least every half-length of pipe.
8.
Press top of drilling unit throttle switch until engine is at full
throttle.
9.
Adjust fluid pressure.
•
Press and hold top of fluid pump switch until pipe fills and
fluid pressure begins to rise.
•
Adjust fluid flow control to set pressure to appropriate level.
Do not exceed maximum pump setting.
10. Rotate spindle clockwise, full speed.
11. Move carriage forward slowly. Adjust rotation speed control
according to bit size and soil conditions.
12. Locate drill head at least every half-length of pipe.
Summary of Contents for JT920
Page 54: ...54 JT920 JT920L SAFETY SAFETY ALERTS 54 JT920 JT920L SAFETY SAFETY ALERTS...
Page 68: ...68 JT920 JT920L PREPARATION 68 JT920 JT920L PREPARATION...
Page 75: ...JT920 JT920L TRANSPORTATION 75 TOW JT920 JT920L TRANSPORTATION 75 TOW...
Page 76: ...76 JT920 JT920L TRANSPORTATION TOW 76 JT920 JT920L TRANSPORTATION TOW...
Page 167: ......
Page 168: ......
Page 169: ...JT920 JT920L 169 JT920 JT920L 169...