1.
Drive drilling unit off trailer, following directions in
TRANSPORTATION
.
2.
Review bore plan and select drilling unit position and remote
fluid unit position.
Position Drilling Unit and Frame
1.
Start engine and move drilling unit to appropriate distance
from start of bore.
2.
Tilt frame as needed to reach desired entry pitch.
3.
Lower stabilizers until stabilizers begin to put pressure on
ground.
4.
Continue lowering to increase entry pitch.
SETUP
UNLOAD
1.
Drive drilling unit off trailer, following directions in
TRANSPORTATION
.
2.
Review bore plan and select drilling unit position and remote
fluid unit position.
Position Drilling Unit and Frame
1.
Start engine and move drilling unit to appropriate distance
from start of bore.
2.
Tilt frame as needed to reach desired entry pitch.
3.
Lower stabilizers until stabilizers begin to put pressure on
ground.
4.
Continue lowering to increase entry pitch.
Summary of Contents for JT920
Page 54: ...54 JT920 JT920L SAFETY SAFETY ALERTS 54 JT920 JT920L SAFETY SAFETY ALERTS...
Page 68: ...68 JT920 JT920L PREPARATION 68 JT920 JT920L PREPARATION...
Page 75: ...JT920 JT920L TRANSPORTATION 75 TOW JT920 JT920L TRANSPORTATION 75 TOW...
Page 76: ...76 JT920 JT920L TRANSPORTATION TOW 76 JT920 JT920L TRANSPORTATION TOW...
Page 167: ......
Page 168: ......
Page 169: ...JT920 JT920L 169 JT920 JT920L 169...