JT920/JT920L - APPENDIX
157
B. ENTRY PITCH, SETBACK, AND DEPTH
JT920/JT920L - APPENDIX
157
B. ENTRY PITCH, SETBACK, AND DEPTH
JT920L Power Pipe Drill Pipe
EA
SB
d
D
-18
25 ft 0 in (7.26 m)
1 ft 4 in (.40 m)
2 ft 11 in (.88 m)
-20
26 ft 11 in (8.19 m)
1 ft 5 in (.44 m)
3 ft 5 in (1.04 m)
-22
28 ft 9 in (8.76 m)
1 ft 7 in (.49 m)
3 ft 11 in (1.20 m)
-24
30 ft 7 in (9.31 m)
1 ft 9 in (.53 m)
4 ft 6 in (1.37 m)
-26
32 ft 4 in (9.86 m)
1 ft 10 in (.57 m)
5 ft 1 in (1.55 m)
-28
34 ft 1 in (10.40 m)
2 ft 0 in (.61 m)
5 ft 8 in (1.74 m)
-30
35 ft 10 in (10.92 m) 2 ft 2 in (.65 m)
6 ft 4 in (1.94 m)
Based on:
1. 100’ (30.5 m) minimum bend radius
2.
L
= beacon housing, EZ-Connect, and transition sub, and 1/3 of first
drill pipe (totalling 7’ 5” [2.26 m]) in the ground before steering
JT920L Power Pipe Drill Pipe
EA
SB
d
D
-18
25 ft 0 in (7.26 m)
1 ft 4 in (.40 m)
2 ft 11 in (.88 m)
-20
26 ft 11 in (8.19 m)
1 ft 5 in (.44 m)
3 ft 5 in (1.04 m)
-22
28 ft 9 in (8.76 m)
1 ft 7 in (.49 m)
3 ft 11 in (1.20 m)
-24
30 ft 7 in (9.31 m)
1 ft 9 in (.53 m)
4 ft 6 in (1.37 m)
-26
32 ft 4 in (9.86 m)
1 ft 10 in (.57 m)
5 ft 1 in (1.55 m)
-28
34 ft 1 in (10.40 m)
2 ft 0 in (.61 m)
5 ft 8 in (1.74 m)
-30
35 ft 10 in (10.92 m) 2 ft 2 in (.65 m)
6 ft 4 in (1.94 m)
Based on:
1. 100’ (30.5 m) minimum bend radius
2.
L
= beacon housing, EZ-Connect, and transition sub, and 1/3 of first
drill pipe (totalling 7’ 5” [2.26 m]) in the ground before steering
Summary of Contents for JT920
Page 54: ...54 JT920 JT920L SAFETY SAFETY ALERTS 54 JT920 JT920L SAFETY SAFETY ALERTS...
Page 68: ...68 JT920 JT920L PREPARATION 68 JT920 JT920L PREPARATION...
Page 75: ...JT920 JT920L TRANSPORTATION 75 TOW JT920 JT920L TRANSPORTATION 75 TOW...
Page 76: ...76 JT920 JT920L TRANSPORTATION TOW 76 JT920 JT920L TRANSPORTATION TOW...
Page 167: ......
Page 168: ......
Page 169: ...JT920 JT920L 169 JT920 JT920L 169...