JT920/JT920L - PREPARATION
INSPECT SITE
58
JT920/JT920L - PREPARATION
INSPECT SITE
Select Start and End Points
Select one end to use as a starting point. Consider the following
when selecting a starting point:
Slope
Fluid system should be parked on a level site. Consider how
slope will affect drilling unit setup, bending pipe, and fluid flow out
of hole.
Traffic
Vehicle and pedestrian traffic must be a safe distance from
drilling equipment. Allow at least 10’ (3 m) buffer zone around
equipment.
Space
Check that starting and ending points allow enough space for
gradual pipe bending. See "Minimum Setback" in this chapter.
Check that there is enough space to work and to set up electric
strike system.
Comfort
Consider shade, wind, fumes, and other site features.
Drill downhill when possible so fluid will flow away from drilling
unit.
Select Start and End Points
Select one end to use as a starting point. Consider the following
when selecting a starting point:
Slope
Fluid system should be parked on a level site. Consider how
slope will affect drilling unit setup, bending pipe, and fluid flow out
of hole.
Traffic
Vehicle and pedestrian traffic must be a safe distance from
drilling equipment. Allow at least 10’ (3 m) buffer zone around
equipment.
Space
Check that starting and ending points allow enough space for
gradual pipe bending. See "Minimum Setback" in this chapter.
Check that there is enough space to work and to set up electric
strike system.
Comfort
Consider shade, wind, fumes, and other site features.
Drill downhill when possible so fluid will flow away from drilling
unit.
Summary of Contents for JT920
Page 54: ...54 JT920 JT920L SAFETY SAFETY ALERTS 54 JT920 JT920L SAFETY SAFETY ALERTS...
Page 68: ...68 JT920 JT920L PREPARATION 68 JT920 JT920L PREPARATION...
Page 75: ...JT920 JT920L TRANSPORTATION 75 TOW JT920 JT920L TRANSPORTATION 75 TOW...
Page 76: ...76 JT920 JT920L TRANSPORTATION TOW 76 JT920 JT920L TRANSPORTATION TOW...
Page 167: ......
Page 168: ......
Page 169: ...JT920 JT920L 169 JT920 JT920L 169...