82
JT920/JT920L - SETUP
ASSEMBLE DRILL STRING
82
JT920/JT920L - SETUP
ASSEMBLE DRILL STRING
Attach EZ-Connect
Option A
1.
Apply tool joint compound to
threads and hand tighten pin-to-
pin adapter (4) to beacon housing
(1).
2.
Attach quick wrench in join
position.
•
Place jaws (1) on wrench flats on both sides of joint.
•
Pin handles (2) to wrench jaws. Be sure handles are both
up.
•
Attach pivoting nut heads (3) so that screw (4) is over
joint.
•
Turn screw to pull handles together.
Attach EZ-Connect
Option A
1.
Apply tool joint compound to
threads and hand tighten pin-to-
pin adapter (4) to beacon housing
(1).
2.
Attach quick wrench in join
position.
•
Place jaws (1) on wrench flats on both sides of joint.
•
Pin handles (2) to wrench jaws. Be sure handles are both
up.
•
Attach pivoting nut heads (3) so that screw (4) is over
joint.
•
Turn screw to pull handles together.
Summary of Contents for JT920
Page 54: ...54 JT920 JT920L SAFETY SAFETY ALERTS 54 JT920 JT920L SAFETY SAFETY ALERTS...
Page 68: ...68 JT920 JT920L PREPARATION 68 JT920 JT920L PREPARATION...
Page 75: ...JT920 JT920L TRANSPORTATION 75 TOW JT920 JT920L TRANSPORTATION 75 TOW...
Page 76: ...76 JT920 JT920L TRANSPORTATION TOW 76 JT920 JT920L TRANSPORTATION TOW...
Page 167: ......
Page 168: ......
Page 169: ...JT920 JT920L 169 JT920 JT920L 169...