
Installing System Components
71
Figure 3-16.
Installing and Removing the Half-Height Tape Backup Unit or Optical Drive
Installing an Internal SCSI Tape Backup Unit
This subsection describes how to configure and install an internal SCSI tape backup unit in the
peripheral bay.
CAUTION:
Only trained service technicians are authorized to remove the system cover and access any of the
components inside the system. See your
Product Information Guide
for complete information about safety
precautions, working inside the computer, and protecting against electrostatic discharge.
1
Turn off the system, including any attached peripherals, and disconnect the system from the electrical
outlet.
2
Remove the front bezel, if attached. See
"Removing the Bezel" on page 50
.
3
Open the system. See
"Opening the System" on page 53.
1
IDE or SCSI ribbon cable
2
power cable
3
release latch
4
half-height tape backup unit or
optical drive
5
peripheral bay
1
4
2
3
5
Summary of Contents for POWER EDGE 2900
Page 34: ...34 About Your System ...
Page 48: ...48 Using the System Setup Program ...
Page 114: ...114 Installing System Components ...
Page 138: ...138 Running the System Diagnostics ...
Page 146: ...146 Jumpers and Connectors ...
Page 176: ...176 Glossary ...
Page 182: ...82 Index 182 Index ...